Hello, Is there a way of having a Location default to a Works Order BoM line to consume a raw material. So let's say we have a warehouse with 3 locations - A, B & C. When I raise a WO I want it to consume the raw material it needs only from location B?
I know that once a WO has been raised I can set the location on the WO BoM line but this is obviously mannually intensive so is there a way to get it to default the location in?
*This post is locked for comments